N05-A Compression Module

Following the successful construction of the N05-A offshore gas production platform, Smulders HSM was once again selected by ONE-Dyas for the next phase of the N05-A development.

The new contract covers the construction and integration of a compression module that will support the continued efficient production of natural gas from the N05-A field in the Dutch North Sea.

Client ONE-Dyas
Location Dutch North Sea / German North Sea
Contract Construction and integration
Contract award 2026
Completion Mid-2027
Smulders HSM awarded contract by ONE-Dyas for next phase of N05-A development

Supporting continued efficient production

The compression module will consist of two independent compression trains, allowing the N05-A platform to operate at two different pressure regimes as conditions in the field evolve over time. The module will measure approximately 27.2 by 15.0 by 15.0 metres and will have an estimated dry weight of 875 tonnes, including approximately 350 tonnes of structural steel.

Dimensions
  • Approximately 27.2 x 15.0 x 15.0 metres
Weight
  • Estimated dry weight: Approximately 875 tonnes
  • Structural steel: Approximately 350 tonnes

Integrated project execution

Smulders HSM will execute the project through an integrated delivery team with SPIE, in close cooperation with ONE-Dyas.

By operating as one project team, the partners aim to reduce interfaces, improve decision-making and increase efficiency throughout the engineering, procurement, construction and installation phases. Offshore installation contractor Scaldis will contribute its expertise to the installation planning, logistics and offshore execution.

Integration into low-emission infrastructure

The compression module will be installed on the existing N05-A platform, which has been in operation since March 2025.

N05-A is the first offshore gas production platform in the North Sea to operate entirely on electricity generated by offshore wind. The platform is connected to the nearby German Riffgat offshore wind farm, which provides the electricity required to operate its production facilities. As a result, operational emissions from the platform have been reduced to near zero.

The new compression module will become part of this existing low-emission infrastructure and support the next phase of production from the N05-A field.

Project Overview N05-A Compression Module

Smulders HSM awarded contract by ONE-Dyas for next phase of N05-A development
N05-A Compression Module render.jpg
Scroll to discover